biểu ngữ 内页

Sơn chống thấm PU

Trang chủ Sơn chống thấm PU

Good Quality Polyurethane Waterproof Coating

Good Quality Polyurethane Waterproof Coating

  • Vật liệu :

    Polyurethane (Eco-friendly PU)
  • Màu sắc :

    Black ,Blue,White,Gray.Also Can Be Custom
  • Hình dạng :

    Liquid
  • Thông số kỹ thuật :

    2kg,5kg,10kg,20kg,50kg
  • Bảo hành :

    3 Years
  • Liều lượng tham khảo :

    2KG/㎡
  • Nhiệt độ tối ưu :

    5℃-35℃
  • Xuất xứ sản phẩm :

    China
  • Sự chi trả :

    T/T,L/C
  • Cảng vận chuyển :

    Shanghai, Shenzhen, Ningbo...

Video Description


Product Overview

Hydrostatic polyurethane elastic waterproof coating is a high-tech product developed by the introduction of advanced technology from the United States. It is an environmentally friendly polymer elastic waterproof material. The product is non-toxic and tasteless, has good adhesion and impermeability, and has strong adhesion to mortar cement base surface, stone and metal products. High strength, large elongation, good elasticity, good waterproof effect.

 

 

Scope Of Application

Roofing, color steel tile, basement, civil air defense works, kitchen and bathroom, culvert, tunnel, bridge, pool, metal pipeline, workshop floor; Wood flooring, cement board, asbestos products, fiberglass products, ceramic products, etc.

 

 

Performance Characteristics

  1. Single component, cold construction, safe use.
  2. It can be constructed on wet (no clear water) or dry base surface, and the coating is tough and elastic.
  3. For masonry, mortar, concrete, metal, foam board, insulation layer, etc., have a strong adhesion.
  4. Safe, simple and short construction period.

 

 

Item Argument
Tensile strength ≥1.0
Fracture elongation, %  ≥300
Low temperature flexibility (180° bending around a midSolid reserves Solid reserves φ10mm bar)  -10℃ No crack 
Impermeability (0.3Mpa, 30min)  Impermeability
Solid reserves  ≥65

 

 

Base Treatment

Must be smooth, firm, clean, no leakage, no ash, no sand, uneven first leveling. Leakage must be blocked first (recommended to use "quick coagulation type water does not leak" for plugging): Yin and Yang Angle should be made of arc Angle.

 

 

Construction Procedure

  1. Wet the base first.
  2. Roll back and forth with the roller on the base surface, the coating should be as uniform as possible, there can be no local deposition, and it is required to roll and brush several times, so that there are no bubbles between the paint and the base surface, and the bond is firm.
  3. The time interval between the layers before a layer of paint dry solid, non-stick prevail (generally 2-6 hours, the site temperature is low, humidity, poor ventilation, drying time is longer;Otherwise shorter) Try to increase the interval.
  4. If the thickness of the waterproof layer is not enough (especially the facade construction), one or several layers can be added.
  5. The waterproof layer of outdoor and easy to touch and tread parts should be a protective layer.The construction of the protective layer or decorative layer shall be carried out 2 days after the completion of the waterproof layer.When applying mortar, in order to facilitate construction, clean medium coarse sand can be sprinkled immediately after the last coating of the waterproof layer, but the sand is only limited to the facade.

 

 

 

Matters Needing Attention

  1. Can not be constructed below 0 ° C or in the rain, should not be constructed in a particularly humid and unventilated environment, otherwise it will affect film formation.
  2. If the base surface is too dry, 20-30% of the paint should be added to the water, stir well and roll coating.
  3.  Each layer of coating must be constructed according to the amount specified in the construction method, and can not be too much or too little.
  4. At the interval or end of construction, clean the construction equipment and work clothes stained with paint with water as soon as possible.

 

 

Transport And Storage

  1.  Transport according to non-dangerous goods requirements. During transportation, prevent rain, exposure, extrusion, collision, inversion, and keep the package intact. The ambient temperature during transportation should not be lower than 0 ° C, otherwise insulation measures should be taken.
  2. This product should be stored in a ventilated, dry and cool place to prevent direct sunlight. Storage temperature should not be lower than 5℃, must not be lower than 0℃.
  3. Under normal storage and transportation conditions, the storage period is 6 months.

 



 

Our Services

√  Customizable Logo

  Customizable Packaging

  Online Technical Support Available

  Can Undertake Construction Projects

 

Để lại tin nhắn
Nếu bạn quan tâm đến sản phẩm của chúng tôi và muốn biết thêm chi tiết, vui lòng để lại tin nhắn tại đây, chúng tôi sẽ trả lời bạn ngay khi có thể.
Recommended

Sản phẩm liên quan

Để lại tin nhắn

Để lại tin nhắn
Nếu bạn quan tâm đến sản phẩm của chúng tôi và muốn biết thêm chi tiết, vui lòng để lại tin nhắn tại đây, chúng tôi sẽ trả lời bạn ngay khi có thể.
nộp

Trang chủ

Các sản phẩm

whatsApp

liên hệ